Purpose |
Fix counter on rescheduling |
Release No |
001 |
Submitted on |
11/2/2016 |
Submitted by |
Surya Basa |
Environment |
NECNED to NECNEQ |
Sent To |
Dan Brennan |
Object(s) created by |
Damodhier Sanagana |
Object(s) tested by |
Surya Basa |
Transport Status |
Created in NECNED100 |
Sl. |
Transport ID |
Description |
Object Name |
1 |
NEDK937789 |
SD:28002:ReschedulingChanges to fill Cus.table for PO Qty/Dd |
ZCL_IM_ME_PURCHDOC_POSTED ZME_PURCHDOC_POSTED ZSD_RESCH |
2 |
NEDK937815 |
SD:28002:Resch.wrapper program&Post proc.chgs for Cus. Table |
ZRSD_RESCHEDULING_DEL ZSD_WRAPPER_RESCH |
Test ID |
Scenario |
Expected Results |
Actual Results |
Documents |
P/F |
Notes |
Tested By |
QA By |
SD001 |
Integrity Test - Compare standard with Z prg - 0116 variant in simulation mode with Std prg - 0116 variant in normal mode with Z prg |
Results of the both the jobs should be consistent |
Ztable - 16 mat After Job - 12 mat (matched spool data) |
10029527 10047537 11032785 10982652 10047285 10047653 11089836 11089837 11089838 11089835 11089839 70217116 10003436 10002059 10234047 10234048 |
P |
N/A |
Surya Basa |
Deepak Yasam |
SD002 |
Create job with 5 variants - 0116/7/0210/80/0510 (5 steps) ; each variant 20K materials Step - 6 should be the post processing/clean up program |
- Child jobs should be triggered for each variant - Rescheduling should be performed on the sales orders and spool/log updated updated correctly - Clean up program should update the Ztable by deleting materials that do not satisfy the criteria |
Child jobs triggered for all the variants and spool was updated; ztable was updated and unwanted materials were removed |
NA |
P |
N/A |
Surya Basa |
Deepak Yasam |
SD003 |
Run the above job - variant 0117 to be blank |
Child job should not be triggered for 0117 and the remaining variants/steps should be processed |
Child job didn't trigger for 0117 |
NA |
P |
N/A |
Surya Basa |
Deepak Yasam |
SD004 |
Run the job in test 1 with variants 0117/0510 blank |
Child jobs should not be triggered for 0117/0510; other variants/steps should be processed |
Child jobs didn't trigger for 0117 and 0510 |
NA |
P |
N/A |
Surya Basa |
Deepak Yasam |
SD005 |
User Exit - Update qty/delivery date on a given PO |
Ztable should be updated with the corresponding materials |
Materials were updated to the ztable |
000000000070064101 - Qty Change 0210 Plant 000000000010743382 - Dt change; 0510 plant |
P |
N/A |
Surya Basa |
Deepak Yasam |
SD006 |
Open SO - Open SO on 0116 and not on 0117 (different materials) |
Rescheduling should not be carried for the material on 0117 but should on 0116; post processing prg should remove the materials from the ztable |
Rescheduling was carried out for the SO on 0116 but not on 0117; post processing program deleted the materials from the ztable |
70187777 - 0116 11045058 - 0117 |
P |
N/A |
Surya Basa |
Deepak Yasam |
SD007 |
Open SO - Open SO on 0210 and not on 0510 for the same material; SO delivery date outside RLT |
Rescheduling should not be carried for the material on 0510 and 0210; post processing prg should remove the material from 0510 and not on 0210 |
Rescheduling was not carried out for for the material on 0210 and 0510; material remained on 0210 and removed from 0510 |
10743382 - 0210 and 0510 SO - 1959758 |
P |
N/A |
Surya Basa |
Deepak Yasam |
SD008 |
Credit Block - Open SO on credit block on 0210 and not on 0510 for the same material |
Rescheduling should not be carried for the material on 0210 but should on 0510; post processing prg should not remove the material from 0510 and 0210 |
Rescheduling was carried out for for the material on 0210 but not on 0510 |
1959761 - 0210 4500105138 - 80037547 - 0510 |
P |
N/A |
Surya Basa |
Deepak Yasam |
Test ID |
Test Scenario |
Expected Results |
Actual Results |
P/F |
Documents |
Notes |
Tested By |
QA By |